Data Center Construction Technician – Entry Level

FieldLink


Job Title: Data Center Construction Technician – Entry Level

Reports To: Lead Data Center Technician and Project Manager

Promotes To: Data Center Technician II or Lead

Pay: $18-24/hr based upon experience

Wanted: People with a skilled trade background or apprentice background in electrical or mechanical trades (HVAC, Plumbing, Carpentry, Construction, Landscaping, Etc.) to step into the growing Data Center industry.

*Veterans Encouraged to Apply*

*Covid-19 Vaccination Preferred*

Overview:

FieldLink is a network infrastructure staffing company helping people find rewarding careers in the Telecom and Low Voltage Industry. We specialize in customized staffing partnerships with industry leading integrators responsible for large commercial projects and government contracts nation-wide.

We are hiring for Data Center Construction Technician – Entry Level to work in the NOVA area. This role is contract-to-hire and is a great opportunity for growth, continued industry training, and a career path.

Job Responsibilities:

· Cable infrastructure and Fiber rough in.

· Cable management (dressing and labeling).

· Cable and Fiber termination.

· Rack and stack customer equipment.

· Server rack build out and rack elevation.

· Install fiber tray, ladder rack, customer equipment, and cabinets (Laser levelling, threaded rod insallation

· Infrastructure installs (cable management, fiber tray systems, ladder racks, power trays).

· Material receiving and hardware assembly.

· Outside Plant (OSP) installation (run fiber into Data Center).

· Read and follow blueprints set for installation.

· Follow written and oral communication displaying professionalism with colleagues and management.

· Follow safety guidelines and protocols (Proper PPE, clean up jobsite, OSHA).

Job Requirements:

· High School Diploma or GED equivalency

· 0-2 years of Data Center Technician experience

· Active OSHA 10 – preferred

· Physical Requirement: Must be able to work on a ladder and/or scissor lift, in confined spaces, lift up to 50 pounds, and move up to 75 pounds. Ability to work on your feet for entire shift.

  • Tools: Power Tools: Bandsaw, Rotary Hammer, Impact Driver. Basic Hand Tools: screwdriver (multi-Bit), tape measure, snips, pliers (needle nose and channel locks), punch down tool, flashlight, work boots (steel toe or composite toe) gloves and tool pouch.

Job Types: Full-time, Contract

Pay: $18.00 – $24.00 per hour

Benefits:

  • 401(k)
  • Dental insurance
  • Health insurance
  • Vision insurance

Schedule:

  • 10 hour shift
  • 12 hour shift
  • 8 hour shift
  • Day shift
  • Overtime

Application Question(s):

  • COVID-19 Vaccination Preferred. Are you Vaccinated?

Experience:

  • Hand Tools or Power Tools: 1 year (Required)

Work Location: One location

Quick Apply
To help us track our recruitment effort, please indicate in your cover/motivation letter where (jobsinteelecom.net) you saw this job posting.